On Monday 30 November 2026, two changes to housing conditions in England come into force together. Phase 2 of Awaab’s Law widens the hazards social landlords must deal with to fixed timescales. A revised Pre-Action Protocol for Housing Conditions Claims changes how disputes about those hazards run. For landlords, solicitors and anyone who instructs a surveyor, the shared start date is no coincidence. The quality of the evidence behind each case now matters more than ever.
What changes under Awaab’s Law Phase 2
Phase 1 of Awaab’s Law came into force on 27 October 2025. It requires registered providers of social housing to put right significant damp and mould hazards within set timeframes. The same duty applies to all emergency hazards.
From 30 November, seven more hazard categories come within scope:
- excess cold
- excess heat
- falls
- fire and explosions
- electrical hazards
- domestic hygiene and pests
- structural collapse.
The government has also updated the definitions of “emergency” and “significant” hazards. That means landlords cannot simply carry their Phase 1 procedures forward. The government expects a third and final phase in 2027. That phase will cover every remaining hazard in the Housing Health and Safety Rating System except overcrowding.
The sector is not fully ready. Only 4% of social landlords in a Housemark survey described themselves as “very prepared” for the expansion.
What changes in the revised Pre-Action Protocol
The Master of the Rolls approved the revised Pre-Action Protocol for Housing Conditions Claims (England) on 30 October. It takes effect on the same day as Phase 2. Four changes stand out.
First, the Protocol now expressly covers claims involving hazards. That includes claims under Section 10A of the Landlord and Tenant Act 1985, the fitness for human habitation provision.
Second, it recognises the timeframes landlords must meet under Awaab’s Law.
Third, it deals with urgent cases, such as an alleged serious risk to health or welfare. In those cases, full compliance with the Protocol may not be appropriate.
Fourth, it places greater weight on alternative dispute resolution. Both sides should consider whether that would settle matters better than court proceedings.
One principle stays the same. The Protocol still limits expert evidence to what the case reasonably requires.
Why the timing matters
Put the two changes side by side and the direction is clear. More hazards now carry statutory deadlines. As a result, tenants and their solicitors will frame more complaints as hazard claims rather than simple disrepair. At the same time, the courts want fewer experts, earlier engagement and settlement where possible.
That puts a premium on a single, independent, well evidenced inspection report that both sides can rely on. A weak report slows a case down. It confuses symptoms with causes, uses old hazard categories or leaves the required works unclear. A clear report can settle a case.
Under Phase 2, the history of a property also counts for more. When a tenant reports a new hazard, earlier complaints, previous inspections and past repairs all matter. Together they show whether the landlord has acted reasonably. Good records, and reports that refer to them, support both the defence and the claim.
What good surveyor evidence looks like now
In our experience, the most useful reports share several qualities. An independent surveyor prepares them in line with CPR Part 35. That leaves no doubt about the surveyor’s duty to the court. They assess hazards against the current Housing Health and Safety Rating System. The government cut that system from 29 hazards to 21 in June 2026.
Good reports separate disrepair from hazard, and both from problems that come from how a home is used. Each leads to a different legal answer. They record causes as well as symptoms, with photographs and readings to back them up. Finally, they set out a prioritised schedule of works. A landlord can act on it, and a solicitor can measure it against the Awaab’s Law timescales.
What to do before 30 November
Social landlords should check that their triage, inspection and repair procedures cover all seven new hazard categories. Those procedures also need to reflect the updated definitions. Staff making first assessments need access to competent technical advice.
Solicitors acting for tenants or landlords should review how they handle expert instructions under the revised Protocol. The case for a single joint expert and the urgent case provisions deserve particular attention.
Whichever side you are on, early independent inspection is the quickest way forward. It gives everyone an agreed view of what is wrong and what happens next.
How Cube can help
Cube Building Consultancy is a RICS regulated practice led by Jim Mallams BSc(Hons) FRICS, C Build E MCABE. We prepare independent housing disrepair and hazard reports for housing associations, local authorities and legal firms. We act for either party or as single joint expert. When a case cannot wait, we offer rapid triage inspections.
Would you like to talk through how the 30 November changes affect your caseload or your stock? Contact us here.
This article reflects the position at 25 November 2026. It is general information, not legal advice.